HUNTLY e3p POWERSTATION PROJECT
Heavy haulage transport and installation contract Huntly e3p Project. The logistics included a 377 tonne Gas turbine, 354 tonne Generator and a 255 tonne Transformer. Installation was completed using the Heavy Lifting ‘lift n lock’ Gantry System